"Old Navy"
Bedford, NH
This gorgeous, one-of-a-kind beauty has custom painted cabinetry, heated tile floor, large walk-in shower with multiple niches and shaving shelf, lighted mirrors, custom wainscoting and millwork, and a new 3-panel solid Shaker door.
This bathroom was totally reconfigured and featured extensive plumbing re-work. There was significant re-framing of exterior and interior walls and the space was re-insulated. We also removed one of the windows in the corner next to the new shower and installed a smaller picture window. This space gets loads of natural light.
For a project like this, you should budget $100,000-$125,000.
Before
Before
Before
Before
Before
During Major Plumbing Re-work
During
After
After
After
After
After
After
After
After
After
After
After
After
©2020 Image Contracting, LLC